Sample site · ashdub. Electrician design · In final release checks, not installable yet. Nothing here is sent, booked or soldBack to the design

Planned work

Surveyed, quoted, then done.

Planned jobs start with a few questions about the property and a site visit, so the quote reflects what's really there.

Floor plan line drawing with light points, sockets, a consumer unit and the planned cable routes dashed in blue

The work

Planned jobs and prices

  1. Consumer unit replacement

    Electrician to confirm

    A modern board with the protection the installation needs.

  2. Full rewire

    Electrician to confirm

    Every circuit replaced, room by room.

  3. Partial rewire

    Electrician to confirm

    Selected circuits or rooms.

  4. Sockets and lighting

    Electrician to confirm

    New or moved points, indoors and out.

  5. Fault finding

    Electrician to confirm

    Tracing a fault that comes and goes.

  6. Inspection and testing

    Electrician to confirm

    A condition report on the whole installation.

Line drawing of a wall-mounted electric vehicle charge point with its cable coiled below

Charge points

A charge point, planned around your supply.

The site visit checks the supply, where the charge point and cable can go, and what certificate and notification the work needs.

  • Supply and earthing checked at the survey
  • Cable route agreed before work starts
  • Certificate handed over at the end