Sample site · Slow Reach design · in design review, preview only. Nothing here is sent, booked or soldBack to the design

Day one

From the car park to the first lock.

About two hours, most of it on the water.

  1. 14:00, the wharf

    Park, unload and have a tea while we carry the bags aboard

  2. 14:30, the engine

    Daily checks, the fuel, the water and the toilet, on a card you keep

  3. 15:00, the tiller

    You steer down to the winding hole and turn the boat round

  4. 15:45, the first lock

    We work it together; you do the second one on your own

  5. 16:30, away

    We wave you off with the route card and our phone number

Safety

The four things we insist on.

  1. Life jackets

    For children on deck, always; for adults working locks after dark

  2. The cill

    Keep the boat forward of the white line when a lock empties

  3. The windlass

    Stay with it on the spindle until the paddle is down

  4. One on the stern

    Someone at the tiller whenever the engine runs

Questions people ask

We have never done this.

Most of our guests have not. The handover is the whole point.

What if something breaks?

Call us. An engineer reaches anywhere on our routes the same day.

Can we eat out?

Yes: each route card marks pubs with moorings, and the market towns on the week loop.

What do we bring?

Food, clothes, soft bags and flat shoes. Everything else is aboard.

Ready to choose your dates?