Day one
From the car park to the first lock.
About two hours, most of it on the water.
14:00, the wharf
Park, unload and have a tea while we carry the bags aboard
14:30, the engine
Daily checks, the fuel, the water and the toilet, on a card you keep
15:00, the tiller
You steer down to the winding hole and turn the boat round
15:45, the first lock
We work it together; you do the second one on your own
16:30, away
We wave you off with the route card and our phone number
Safety
The four things we insist on.
Life jackets
For children on deck, always; for adults working locks after dark
The cill
Keep the boat forward of the white line when a lock empties
The windlass
Stay with it on the spindle until the paddle is down
One on the stern
Someone at the tiller whenever the engine runs
Questions people ask
We have never done this.
Most of our guests have not. The handover is the whole point.
What if something breaks?
Call us. An engineer reaches anywhere on our routes the same day.
Can we eat out?
Yes: each route card marks pubs with moorings, and the market towns on the week loop.
What do we bring?
Food, clothes, soft bags and flat shoes. Everything else is aboard.
Ready to choose your dates?
Slow Reach (sample business) is a sample business. Its forms, bookings and basket are switched off — nothing you do here is sent, saved or sold.
Like Slow Reach?
Pick how you'd start from it. We'll keep your choice — this design, the page you were on and anything you tell us.
- Use this designStart from it as it is
- Change a few thingsYour name, logo, colours, photos and sections
- Adapt it from my briefTell us about your business and we'll fit it to you
Installing designs opens after their review, with your own account. Nothing is installed or created from this page, and previewing is free.
Pages
- Slow Reach
- Boats
- Routes
- Aboard
- Book
- Privacy and Terms
Built around
- Bookings — demo only here
- Enquiries — demo only here
- Several pages
You'd still connect
- Your boat calendar
- Your route notes
- Who does the handover